Entrance transformation project in Melbourne

Full Entrance Upgrades

Entrance Transformations Melbourne

More than a door swap. We widen openings, increase heights, add sidelights, and install new entrance systems. One team handles the structural work, the door, and the installation. From $5,445 inc GST supplied and installed.

What’s included in every supply & install quote:

  • Delivery to your door
  • Professional installation by our own team
  • 3 × premium hinges
  • Zanda Zenith entrance set (handle + deadbolt, keyed alike)
  • Old door removal & disposal
  • Full site clean-up
  • 2-year workmanship warranty on the install

Final price depends on door size, frame condition, and extras identified in your photos.

What’s Included

More Than a Door Swap

An entrance transformation changes the opening itself. Wider frames, taller heights, sidelights, pivot conversions, new cladding and hardware. One team handles everything.

Widening Door Openings

Convert a single door to a wider entry, or add sidelight panels. We handle the lintel, framing, and cladding so you don’t need to coordinate a separate builder.

Height Increases

Standard openings sit at 2040mm. We increase to 2340mm or taller to suit oversized and architectural doors. The difference in how the entrance feels is immediate.

Sidelights & Transom Windows

Fixed glass panels beside or above the door. Sidelights bring natural light into the hallway and make narrow entrances feel wider.

Pivot Door Conversions

Replace a hinged door with a concealed pivot system. Pivot doors can run wider and taller than standard hinged entries.

Learn about pivot doors

Full Entrance Redesigns

New frame, new door, new architraves, new cladding. Everything from the brickwork in gets replaced.

Investment

Project-Quoted to Your Scope

Every entrance transformation has a different scope of structural work. We quote to the project, not a price list.

Standard Entrance

From $5,445 inc GST supplied and installed

Final price depends on door size, frame condition, and extras identified in your photos.

Door replacement with frame modifications. Widening to add a sidelight, or height increase to 2340mm. Includes structural work, new frame, door supply and installation.

Best for: Straightforward entrance upgrades

Architectural Entrance

POA

A one-off entrance design with a custom-manufactured door through the Bespoke Doors workshop in Moorabbin. Custom timber, glass, and hardware specifications built to your brief.

Best for: One-of-a-kind statement entrances

Why Us

Entrance Door Specialists

We don’t do kitchens, bathrooms, or general carpentry. Entrance doors and external doors across Melbourne. That’s it. You’re getting a team that does this work every week, not a builder fitting it in between other jobs.

We handle the structural modifications. Lintel, framing, cladding. And manufacture through Bespoke Doors at 7 Nelson St, Moorabbin. That’s how we keep turnaround to two to three weeks instead of the industry-standard eight to twelve.

Entrance transformation by Doors Replaced

The Process

How It Works

Four steps. No site visit needed to get started. Most jobs are quoted from photos alone.

01

Upload Photos

Send us photos of your current entrance through our online form. Include the door, the frame, and the surrounding wall. Takes about 60 seconds.

02

We Review & Recommend

We assess the structural requirements and come back with options. You’ll get a clear scope of what’s involved and a price range based on your photos.

03

Site Measure

We visit to confirm dimensions, check the lintel and framing, and lock in finishes and hardware. This is where we catch anything the photos missed.

04

Supply & Install

Full installation, typically in a single day. We remove the old entrance, complete structural modifications, and install the new door system. Two to three weeks from order.

FAQ

Common Questions

How wide can you make my front door opening?

It depends on the wall structure above the opening. Most brick veneer homes can be widened to accommodate a door plus one or two sidelights. Up to around 1800mm total opening width. With a new lintel. We assess the structural requirements at the site measure.

Do I need council approval to widen my entrance?

Generally, no. Widening a door opening is typically exempt from planning permits in most Melbourne council areas. It may require a building permit depending on the scope of structural work. We’ll advise during quoting.

How long does an entrance transformation take?

Two to three weeks from order to installed door. The on-site installation is usually completed in a single day for straightforward transformations, or two days for larger structural jobs.

Can you add sidelights to my existing front door?

Yes, if the wall structure allows it. We widen the opening to one side or both, install a new wider frame, and add fixed glass sidelight panels. Feasibility gets confirmed at the site measure.

What’s the difference between this and a front door replacement?

A front door replacement is a like-for-like swap. Same opening size. An entrance transformation changes the opening itself. That means structural work to widen, raise, or reshape the entry before the new door goes in.

Ready?

Ready to Transform Your Entrance?

Send us a few photos of your current entrance and we’ll tell you what’s possible. Most projects can be scoped from photos and measurements alone. No obligation, no site visit needed to start.

Takes less than 60 seconds.